Thursday, June 4, 2020

THE BEST CESIM TIPS - CESIM GLOBAL CHALLENGE - ROUND BY ROUND GUIDE TO WIN CESIM 2022 AND CESIM 2023

CESIM GUIDE AND TIPS - CESIM GLOBAL CHALLENGE - ROUND BY ROUND GUIDE 

CESIM TIPS - CESIM GLOBAL CHALLENGE - ROUND BY ROUND GUIDE 

CESIM WINNING TIPS - CESIM GLOBAL CHALLENGE

------

ROUND BY ROUND GUIDE (Update) WITH NEW STRATEGY TO WIN ALL ROUNDS WITH TOP SALES AND PROFIT

------
FREE ROUND BY ROUND GUIDE & WINNING TIPS
Step by Step explanation for each round - Win all Rounds Strategy
------
FREE PERSONAL SUPPORT FOR 2-3 ROUNDS
Email: cesimhelp2020@gmail.com
Blog: https://cesimhelp2020.blogspot.com

------
NEW
FREE EXCEL FILE FOR CALCULATION OF ALL ROUNDS



------

WINNING TIP 1
ROUND 1 - SAMPLE

USA +20%
ASIA + 30%
EU + 10%


Tech 1
USA: $300 sold 1.100 or $370 sold 700
$250 x 1200 (3)
$230 x 1900 (3)

Asia: $2.500 sold 2.500 or 2.800 sold 1.900
$1700 x 3000 (3)
$1550 x 4300 (3)

EU: $250 sold 1.300
$140 x 1900 (3)
$140 x 2500 (3)

Total production: 6.600 + 1000 + 1000 = 8.800 (max) in both USA and ASIA


Tech 2
USA: $450 sold 300 or 290 sold 550

Asia: 3500 sold 200 or 2500 sold 420

EU: 420 sold 300 or 160 sold 650

Sales: $1.600- 1.900 K 
Profit: $200 - $300 K


Note 1. Do NOT JUST use above numbers because every game is different. 
Check your industry to find best optimal numbers

Note 2. Check Results Report of Practice Rounds to find most effective PRICES and also potential DEMANDS

Tip:
Check your top competitors prices to adjust your prices

Tip:
Add new capacity for Asia + 3
Add new capacity for USA + 3 
to start production from Round 3


NEW
FREE EXCEL FILE FOR CALCULATION OF ALL ROUNDS



WINNING TIP 2
ROUND 2 - SAMPLE

USD +10%
EU + 5%
ASIA + 20%

USA
Tech 1 - $340-350 sold 700-800
$225 x 1800/1900 (4)
Tech 2 - $380-410 sold 400-650
$275 x 400 (1)
ASIA
Tech 1 - 2600 sold 2300 - 2600
$1500 x 4500 (4)
Tech 2 - 3100 sold 500-700
$2200 x 700 (2)
$1900 x 1200 (3)

EUROPE
Tech 1 - 300-350 sold 700-850
$130 x 1700/1900 (4)

Tech 2 - 400 sold 400
$300 x 500 (1)
$200 x 2000 (2)
Sales: $2.000-2.300 
Profit: $350-450

Note:
- Do NOT JUST use above numbers because every game is different. Check your industry to find best optimal numbers
Tip:
Check your top competitors prices to adjust your prices

Total Tech 1: 7.600
Total Tech 2: 1000

Note:
- ADD 3 factories for ASIA to start production from Round 4

NEW
FREE EXCEL FILE FOR CALCULATION OF ALL ROUNDS

------

WINNING TIP 3
ROUND 3 - SAMPLE
USA +8%
EU -8%
ASIA +8%

USA
Tech 1 - $340-350 sold 700-800
$190 x 1800 (5)

Tech 2 - $380-410 sold 400-650
$245 x 1400 (3)

ASIA
Tech 1 - 2600 sold 2300 - 2600
$1350 x 2000/5000 (4)
Tech 2 - 3100 sold 500-700
$ 2150 x 1000/ 1300

Tech 3
$2400 x 1500 (1)

EUROPE
Tech 1 - 300-350 sold 700-850
NO SELL
Tech 2 - 400 sold 400

Tech 3: $500 x 800 (1)

ADD 3 FACTORIES IN ASIA
Sales: $2.100 - 2300
Profit: $260-$330


Note:
- Do NOT JUST use above numbers because every game is different. Check your industry to find best optimal numbers
Tip:
Check your top competitors prices to adjust your prices
Tip:
This round start production Tech 3 

NEW
FREE EXCEL FILE FOR CALCULATION OF ALL ROUNDS


------
WINNING TIP 4
ROUND 4 - SAMPLE

USA -5%
EU 0%
ASIA -7%


USA
Tech 1 - $320-350 sold 700-800
NO
Tech 2 - $380-400 sold 650-800
$230 x 1500 (6)

Tech 4:
$350 x 900 (2)


ASIA
Tech 1 - 2600 sold 2200 - 2400
$1275 x 2800
Tech 2 - 3200 sold 600
NO
Tech 3 - 3800 sold 600 - 800
$2400 x 1500 (1)


EUROPE
Tech 1 - 300-350 sold 700 - 800
NO
Tech 2 - 330 sold 800
$260 x 700/900 (6)

Tech 3
NO
Tech 4 - 380 sold 500 - 600
$ $320 x 2500 / 3900 (2)

ADD 4 FACTORIES IN USA


Sales: $2.300 - 2500
Profit: $350-400

Note:
- Do NOT JUST use above numbers because every game is different. Check your industry to find best optimal numbers
Tip:
Check your top competitors prices to adjust your prices


NEW
FREE EXCEL FILE FOR CALCULATION OF ALL ROUNDS



------

WINNING TIP 5
ROUND 5 - SAMPLE
USA +20%
EU + 15%
ASIA + 40%

USA
Tech 1 - $330-340 sold 700-800
NO
Tech 2 - $360-400 sold 850-1050
$215 x 1350 (8)

Tech 3
NO

Tech 4
$320 x 1700 (4)
$300 x 2700 (8)


ASIA
Tech 1 - 2550-2600 sold 2500 - 2700
$1175 x 2600 (6)
Tech 2 - 3100 sold 800
NO

Tech 3 - 3700 sold 600 - 800 
$2000 x 3000/ 3550 (5)

Tech 4
NO


EUROPE
Tech 1 - 300-310 sold 500  - 600
NO
Tech 2 - 330 sold 600-800
$240 x 1000 (6)

Tech 3
NO

Tech 4 - 380-400 sold 600-800
$315 x 2300 (4)

ADD 4 FACTORIES IN USA

Sales: $2.000- 2300
Profit: $200 - $300

Note:
- Do NOT JUST use above numbers because every game is different. Check your industry to find best optimal numbers
Tip:
Check your top competitors prices to adjust your prices
Check all 30 Winning Tips before setting decisions


NEW
FREE EXCEL FILE FOR CALCULATION OF ALL ROUNDS



------
WINNING TIP 6
ROUND 6 - SAMPLE
USA +20%
EU + 15%
ASIA + 30%

USA
Tech 1 - $320-330 sold 700-800
NO
Tech 2 - $370-380 sold 800-900
$210 X 900 (8)

Tech 3
NO

Tech 4 - $400 sold 600 - 800 
$285 x 600/ 2100 (7)


ASIA
Tech 1 - 2500 sold 3600 - 3800
$ 1125 x 2500 / 2800 (7)

Tech 2
NO

Tech 3 - 3600 - 3800 sold 800 - 1200 
$ 1800 x 3100 (6)

Tech 4
NO



EUROPE
Tech 1
NO
Tech 2 - 330-350 sold 600-800
$220 x 1500 (8)

Tech 3 - 3360 sold 600
NO
Tech 4 - 420 sold 900-1000
$260 x 5160 (7)


TOTAL 

Tech 2 = 2400
Tech 4 = 7200

Total ASIA = 5900
Total USA = 9600
 Sales: $2.700 - 3700
Profit: $500-700

Note:
- Do NOT JUST use above numbers because every game is different. Check your industry to find best optimal numbers
Tip:
Check your top competitors prices to adjust your prices

NEW
FREE EXCEL FILE FOR CALCULATION OF ALL ROUNDS

------

WINNING TIP 7
ROUND 7 - SAMPLE

USA
Tech 1 - $320-330 sold 700-800
NO
Tech 2 - $370-380 sold 800-900
$205 X 680 (8)


Tech 3
NO

Tech 4 - $400 sold 600 - 800 
$285 x 2.800 (8) / 3200 (10)


ASIA
Tech 1 - 2000 sold 3600 - 3800
$ 1125 x 2100 / 2600 (7)

Tech 2
NO

Tech 3 - 3600 - 3800 sold 800 - 1200 
$ 1750 x 4000 (8)

Tech 4
NO



EUROPE
Tech 1
NO
Tech 2 - 330-350 sold 600-800
$220 x 1500 (8)

Tech 3 - 3360 sold 600
$170 x 400/ 2400 (8)
Tech 4 - 420 sold 900-1000
$220 x 5600 / 8100 (9)


TOTAL 

Tech 3 = 3100
Tech 4 = 8400

Sales: $2.700 - 3700
Profit: $500-700

Note:
- Do NOT JUST use above numbers because every game is different. Check your industry to find best optimal numbers
Tip:
Check your top competitors prices to adjust your prices

NEW
FREE EXCEL FILE FOR CALCULATION OF ALL ROUNDS



------

WINNING TIP 8
ROUND 8 - SAMPLE

USA
Tech 1
NO
Tech 2 
NO

Tech 3
$ 200 x 300/700 (10)


Tech 4 
$285 x 2.800 (8) / 3200 (10)


ASIA
Tech 1
NO
Tech 2 
NO

Tech 3
$ 1600 x 2900/ 4500 (10)


Tech 4 
$1900 x 1500 (10)



EUROPE
Tech 1
NO
Tech 2 
NO

Tech 3
$ 170 x 1900/ 4500 (10)


Tech 4 
$200 x 5600 (10)


Sales: $3700 - 3800
Profit: $1200 - 1700

Note:
- Do NOT JUST use above numbers because every game is different. Check your industry to find best optimal numbers
Tip:
Check your top competitors prices to adjust your prices


NEW
FREE EXCEL FILE FOR CALCULATION OF ALL ROUNDS
LINK - CECIM EXCEL FILE FREE DOWNLOAD


------

WINNING TIP 9



USA
Tech 1
NO
Tech 2 
NO

Tech 3
$ 200 x 400 (10)


Tech 4 
$210 x 2.800 (10)


ASIA
Tech 1
NO
Tech 2 
NO

Tech 3
$ 1500 x 2900 (10)


Tech 4 
$1700 x 9500 (10)



EUROPE
Tech 1
NO
Tech 2 
NO

Tech 3
$ 160 x 2000


Tech 4 
$170 x 7300 (10)


Note:
- Do NOT JUST use above numbers because every game is different. Check your industry to find best optimal numbers
Tip:
Check your top competitors prices to adjust your prices

NEW
FREE EXCEL FILE FOR CALCULATION OF ALL ROUNDS

Tip:
Check Growth for each market in the Decision - Demand tab

------

WINNING TIP 10




USA
Tech 1
NO
Tech 2 
NO

Tech 3
$ 160 x 1300 (10)


Tech 4 
$180 x 3400 (10)


ASIA
Tech 1
NO
Tech 2 
NO

Tech 3
$ 1400 x 3200 (10)


Tech 4 
$1400 x 1600 / 2800 (10)



EUROPE
Tech 1
NO
Tech 2 
NO

Tech 3
$ 145 x 2200/ 4500 (10)


Tech 4 
$140 x 7500 / 8300 (10)



Note:
- Do NOT JUST use above numbers because every game is different. Check your industry to find best optimal numbers
Tip:
Check your top competitors prices to adjust your prices

NEW
FREE EXCEL FILE FOR CALCULATION OF ALL ROUNDS

Tip:
Check Total market demands in Decision - Demand
Then calculate demands for each product in each market region







------
WINNING TIP 11

For Rounds 1-2-3 produce Tech 1 and Tech 2
Tech 1 - Low Price ($350), low feature, focus on Volume
Tech 2 - High Price ($450), max feature (8-10)
Start R&D for Tech 3 and 4
And increase Production capacity gradually


Check Price and Sold units in each market


RESULT - Market reports (this is very important to calculate next round DEMANDS)
KEY TO GET GOOD SALES AND PROFIT
AGAIN, SOLD UNIT AND PRICES OF LAST ROUND IS VERY IMPORTANT TO CALCULATE SALES FORECAST AND SETTING PRICES FOR NEXT ROUND
CHECK THIS CAREFULLY FROM RESULT - MARKET REPORTS (IN YOUR GAME, FOR EACH REGION, USA, ASIA AND EUROPE)

IF YOU READ AND DO THIS TIP WELL, WIN 50% OF THE GAME ALREADY!




------

WINNING TIP 12
Check Result for Production and Demand
Out source to product more (check cost of production)
Round 2 should increase Feature for Tech 2
Keep track of Price (Price War may begin from Round 2)



CALCULATE DEMANDS FOR NEXT ROUNDS
THIS IS MOST IMPORTANT TO GAIN GOOD SALES AND PROFIT
Tip
Adjust the percentage to get expected sales units
Note that expected sales units come from Market Reports (see tip 11)
Do not expect too high sales, if that happens, will be deduct 10% from profit.









------


WINNING TIP 13

Keep track of Demand
Do not over produce
Do not dump Price too much
Profit is important



CHECK BOTH TABLE


- PRODUCTION
- LOGISTICS


To control Inventory and Production Plan.




------

WINNING TIP 14
Round 4 may also have Price War (competitors dump prices hope to sell more)
Keep track of Demands and Unit sold from Report
Estimate demand carefully
Move to New Tech 3 and 4
To get higher profit margins
Old products can not get good sales and profit margins
Move to Tech 4 (round 3)
and then Move to Tech 3 (round 4)
Depends on Demands
Tech 3 and Tech 4 set prices higher, can plus 20% for Tech 3 and Tech 4


------
WINNING TIP 15
Round 5-7 run all 4 products
or
Round 1-2 use Tech 1 and Tech 2
Round 3-4-5 use Tech 1 and Tech 2 and Tech 3
Round 6-7-8 use Tech 3 and 4 and Tech 1, Tech 2



------
WINNING TIP 16
Tech 3 and Tech 4 can drive Profit in later rounds
- Analyse market demands and outlook
- Check launching chart of Tech 1, Tech 2, Tech 3 and Tech 4 for 10 rounds
- Estimate demands
- Production Plan
- Determine R&D (check competitors)
- Check Logistics Cost and Tax



------
WINNING TIP 17

Market Growth
USA -  EU - Asia
Round 1: 20% - 10% - 30%
Round 2: 10% - 5% - 20%
Round 3: 8% - (-8%) - 8%
Round 4: (-5%) - 0% - (-7%)
Round 5: 20% - 15% - over 40%
Round 6: 20% - 15% - over 30%
Round 7
Round 8



------
WINNING TIP 18
Sales in USA, Asia and EU
R&D in Atlanta (USA)
Plants in USA and new in Asia (not in EU because of labor laws)
Also subcontracts for Production and R&D






------
WINNING TIP 19
Just in Time - therefore no Inventory
Production cost down cost 5-10%
Marketing spend: 3-5% of Sales
R&D spend: 10% of Sales





------
WINNING TIP 20
Advertising
- Good effect in USA
Prices
- Good effect in Asia
Production
- In USA and Asia
- No in EU because of high labor cost





------

WINNING TIP 21
Need one round for own development
License purchase available immediately






------
WINNING TIP 22
Production in 2 regions: USA and Asia
Products in each region: 2 only (only 2 production lines in one area)
In USA can produce max 2 technologies
In Asia can produce max 2 technologies
At any time, max technologies can produce is 4 (Tech 1, Tech 2, Tech 3 and Tech 4)





------
WINNING TIP 23
Application of JIT causes no inventory
If estimate Production higher than demands, auto production down, cost 5-10% additional cost
If estimate Production lower then demands, NO auto increase, lost potential sales





------
WINNING TIP 24
Estimate Total market demands is always the FIRST Step
And most important




------
WINNING TIP 25
Each area can produce 2 Technologies
It has 2 product slots to decide which Tech to produce





------
WINNING TIP 26
For Production
- Keep track of Production cost for each Technology
- Also keep track of Production cost when Outsourcing







------
WINNING TIP 27
- Lowest cost when using 80% production capacity
- New Capacity will be available after 2 ROUNDS, so Invest early







------
WINNING TIP 28
Check cost of production for each Market






------
WINNING TIP 29
Check projection for Estimated Sales and Profit






------
WINNING TIP 30
Long term strategy
Keep track of production capacity of competitors
Profit is more important than Sales
Again, high profit and high sales is more important that top sales












------
KEY WORDS
cesim,
global,
challenge,
strategy,
cesim guide,
cesim tips,
business games,
business simulation games,
how to win cesim,
simulation game,
mba simulation games,

international business simulation,
business strategy simulation,
cesim guide,
cesim tips,
how to win cesim,
best strategy,
step by step guide,
round by round guide,
decision making guide,
cesim answers,
cesim simulation strategy,
how to win cesim,
cesim winning tips,
cesim winning guide,
cesim 2020,
cesim 2021,
cesim tutorial,
personal guide,
personal help,
personal tutorial,
cesim 2020 tips,
cesim 2020 guide,
cesim global challenge,

how to win cesim global challenge,
cesim global challenge tips,
cesim global challenge 2020,
cesim, sample winning strategies,
cesim winning tips,
cesim winning guide,


cesim,
global,
challenge,
strategy,
cesim guide,
cesim tips,
how to win cesim,
best strategy,
step by step guide,
round by round guide,
cesim answers,
cesim winning tips,
cesim winning guide,
cesim 2021,
cesim tutorial,
personal guide,
personal help,
decision making guide,
cesim global challenge,
cesim simulation strategy,
2021,
2022,
2023,
2024,
2025,
cesim free guide,
cesim 2022,
cesim 2023,
cesim 2021 guide,
cesim 2021 tips,
price,
demand,
cesim excel,
spreadsheet,
tutorial
cesim round 1,
cesim round 2,

cesim tutorial,
cesim tutorials,


------

CESIM - The Best Cesim Guide with Helpful Cesim Tips To win Cesim 2022 and Cesim 2023

This is the Quick Guide and Tips to Win Cesim

It is highly encouraged that students review the professor’s notes on the CESIM program for more detailed information on how the program and specific mechanism works.

Also use the update guides and tips

------

Watch the video guides

Video 1 - LINK

Cesim Guide - Step by Step and Round by Round guide for Cesim 2022 and Cesim 2023

The Best Cesim Guide with Helpful Cesim Tips - For Rounds 1 and 2 to win Cesim 2022 and Cesim 2023

Cesim Tips - Top 20 Free Cesim Winning Tips - Guide Step by Step for Round 1 and Round 2


Read the Details Guide and Tips for Cesim 

Post 1 - LINK

THE BEST CESIM TIPS TO WIN CESIM GLOBAL CHALLENGE 2022 - ROUND BY ROUND GUIDE

Post 2 - LINK

CESIM WINNING TIPS - CESIM GLOBAL CHALLENGE - ROUND BY ROUND GUIDE FOR CESIM 2022 AND CESIM 2023

HOW TO WIN CESIM - FREE GUIDE AND TIPS (2022) - CESIM GLOBAL CHALLENGE - ROUND BY ROUND GUIDE


Use Free Excel file to Calculate for Cesim 8-10 rounds

Link to Cesim 2022 Free Excel file - Free Download - Link 


For Free Support for Round 1 and Round 2

Email: CesimHelp2020@gmail.com

Blog: https://top30tipsforcesim.blogspot.com

------



1. Review Competitive Stance

After every round, look at how your team is doing under the Results tab.

How is your market share in the different markets? Is your team performing well in relative to the strategy laid out?

Check your pricing against other team under Results > Market Report. Are you priced competitively in the different markets? Should you invest in features, and in which tech?

This is also where you find out the reasons behind your team’s performance for the round.

Take down notes after your discussion with your team. The analysis will aid in guiding your decisions.

Now, it is time to align your decisions with your analysis. Starting with....

2. Set Market Demands

Go under Decisions > Demand. In CESIM, your sales will be determined by the demand you set. Other than reviewing your team’s analysis of the situation, look at the network coverage. Does the tech you’re planning to sell have coverage in all the markets? If not, should you still sell? How much?

Another measurement you should look at is your market share from the last round. Is it realistic to increase market share? By how much?

3. Production

After you’ve set your demands, it’s time to adjust your production! First, go to Investments.

Make sure your numbers are updated. Then, go back to Production. Play around with both in-house and contract manufacturing to achieve the lowest cost of production per unit. Inhouse manufacturing does not necessarily lead to the cheapest manufacturing cost, and minimizing cost is one of the good ways in increasing your profit!

When it comes to building new plants, remember that you will need 2 rounds before the factories are available. Hence, do it ASAP and early in the project/semester! This is under Investments.

4. Invest in R&D

This is one of the most important aspect of the project. Having more features in a tech can help you gain a competitive advantage = more sales! This is the R&D section of Decisions.

You should have decisions on tech and features as part of your analysis in Step 1. Now, you and your team have another decision to make: Do you want the feature now, or can you wait? If you can wait till the next round, it will be cheaper to develop it in-house. If your team needs it this round to gain a competitive edge, then you’d have to spend more to license it.

5. Marketing

After you have decided on your tech and features, go on to Marketing. A good habit to have is to update all the features you are selling in every market. Make sure that the features you are selling matches the features available.

Then, set the prices according to your team’s analysis. Your promotion price should change accordingly to Professor’s notes.

6. Logistics

As part of minimizing costs, go on to Logistics to adjust the direction in which your products ship in case of maximum capacity. Depending on your strategy for the game, ie. What tech are you selling, where did you make them, and which markets are you targeting, you might want to make adjustments to the direction of your goods. You can only have factories in USA and Asia, so your origin is always from those points. Setting an efficient direction of product flow can help in reducing the shipment costs and fulfil demand.

7. Other Advice

Based on the author’s experience, it is best for the team members to each go through and make individual decisions before coming together and then discuss. Look at who’s profit is the highest, where their decision differ from the rest of the team, and then decide if your team wants to adopt the member’s decision wholly, or adapt it into a different list of decisions that reap the most benefits.

Remember: 

Your grade is not based on which team has the highest profit, but your individual shareholder return under Results > Ratio. Hence, your focus should not be whether other teams are doing better or worse than yours but if your shareholder return is high. The only competition comes in terms of gaining more market share and not outselling the others. Refer to your professor’s grading criteria for more details.


------


------

KEY WORDS

cesim,

global,

challenge,

strategy,

international business simulation,

business strategy simulation,

cesim guide,

cesim tips,

how to win cesim,

best strategy,

step by step guide,

round by round guide,

decision making guide,

cesim answers,

cesim simulation strategy,

how to win cesim,

cesim winning tips,

cesim winning guide,

cesim 2020,

cesim 2021,

cesim tutorial,

personal guide,

personal help,

personal tutorial,

cesim 2020 tips,

cesim 2020 guide,

cesim global challenge,


KEY WORDS 500


cesim,

global,

challenge,

strategy,

cesim guide,

cesim tips,

how to win cesim,

best strategy,

step by step guide,

round by round guide,

cesim answers,

cesim winning tips,

cesim winning guide,

cesim 2021,

cesim tutorial,

personal guide,

personal help,

decision making guide,

cesim global challenge,

cesim simulation strategy,

2021,

2022,

2023,

2024,

2025,

cesim free guide,

cesim 2022,

cesim 2023,

cesim 2021 guide,

cesim 2021 tips,

price,

demand,

cesim excel,

spreadsheet,

tutorial


KEY WORD 150


how to win cesim,

cesim winning tips,

cesim winning guide,

cesim 2022,

cesim 2023,

cesim 2024,

cesim 2025,

cesim guide, 

cesim tips,

best cesim guide,


how to win cesim global challenge,

cesim global challenge tips,

cesim global challenge 2022,

cesim global challenge 2023,


------


Watch the video guides

Video 1 - LINK

Cesim Guide - Step by Step and Round by Round guide for Cesim 2022 and Cesim 2023

The Best Cesim Guide with Helpful Cesim Tips - For Rounds 1 and 2 to win Cesim 2022 and Cesim 2023

Cesim Tips - Top 20 Free Cesim Winning Tips - Guide Step by Step for Round 1 and Round 2


Read the Details Guide and Tips for Cesim 

Post 1 - LINK

THE BEST CESIM TIPS TO WIN CESIM GLOBAL CHALLENGE 2022 - ROUND BY ROUND GUIDE

Post 2 - LINK

CESIM WINNING TIPS - CESIM GLOBAL CHALLENGE - ROUND BY ROUND GUIDE FOR CESIM 2022 AND CESIM 2023

HOW TO WIN CESIM - FREE GUIDE AND TIPS (2022) - CESIM GLOBAL CHALLENGE - ROUND BY ROUND GUIDE


Use Free Excel file to Calculate for Cesim 8-10 rounds

Link to Cesim 2022 Free Excel file - Free Download - Link 


For Free Support for Round 1 and Round 2

Email: CesimHelp2020@gmail.com

Blog: https://top30tipsforcesim.blogspot.com





------

FREE PERSONAL SUPPORT FOR 2-3 ROUNDS
Email: cesimhelp2020@gmail.com
Blog: https://cesimhelp2020.blogspot.com